In Summary:
Eduen's vision reaches deep into a 20-year plan to help recover the planet and educate the people of the world.


Nothing can stop an idea whose time has come:
Eduen was conceived to change the direction we have taken our planet and bring us back from our own path of destruction.







The Cost Summary...


An Investment in Humanity
This section outlines total, inflation-adjusted costs over a projected 20-year horizon for the activities of The Eduen Federation. Costs are provided by year, by project. These costs will be offset ultimately by (1) Infusions of outside capital (2) Operational profits/cash flows. The breakeven point for each Eduen enterprise has been estimated and is indicated in this summary.

YEAR 1

The Three Cornerstones:
$224,323,000

- Eduen Gardens Health Spa & Learning Center
One site: 154 acres in Gresham, Oregon.
Est. Breakeven: 10 years.
Construction begins in Year 1.

- The Eduen Showcase of Green Living
One site: 1,080 acres in Sisters, Oregon.
Est. Breakeven: 10 years.
Construction begins in Year 1.

- Eduen Paradise Health Spa & Natural Healing Center
One site: 171 acres on Kauai in the Hawaiian Islands.
Est. Breakeven: 10 years.
Construction begins in Year 1.

Expansion Sites: Eduen Gardens Health Spas & Learning Centers:

- Nine sites planned, approx. 150 acres each.
Two locations in U.S., seven International.
Est. Breakeven: 10 years per site.
No building starts in Year 1.

Expansion Sites: Eduen Showcases of Green Living:

- Ten sites planned, approx. 1,000 acres each.
Three locations in U.S., seven International.
Est. Breakeven: 10 years per site.
No building starts in Year 1.

Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers:

- Four sites planned, approx. 175 acres each.
All developments in International locations.
Est. Breakeven: 10 years per site.
No building starts in Year 1.

Eduen Infinity Gardens:

- 94 sites planned, approx. 40-60 acres each.
50 locations in the Continental U.S., 44 International.
Est. Breakeven: 2-3/4 years per site.
No building starts in Year 1.

Lumina Water Technologies:

- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
37,448,000
200 sites planned (25 in U.S., 175 International).  
Est. Breakeven: Four years per site.  
No. of building starts in Year 1: Two.  

- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
44,000,000
200 sites planned (15 in U.S., 185 International).  
Est. Breakeven: Four years per site.  
No of building starts in Year 1: Two.  

- Lumina Resort Spas
25,749,625
33 sites planned (three in U.S., 30 International).  
Est. Breakeven: Five years per site.  
No. of building starts in Year 1: One.  

- Lumina Day Spas
50,000,000
214 sites planned (100 in U.S., 114 International).  
Est. Breakeven: Four years per site.  
No. of building starts in Year 1: Two.  


Blue Sky Dome Construction Group:

- Blue Sky Dome Prototype Design and Construction /  
First-Phase Product Testing
3,000,000

One leased location in U.S.
Est. Breakeven: Two years.
No building starts in Year 1 (lease space only).

- Blue Sky Dome Beta Test Project
One site planned (either in U.S. or International).
Est. Breakeven: Six years.
No building starts in Year 1.

Centura Energy Technologies:

- Centura Prototype Engine / Functional Fuel Production Lab /  
Pre-Launch Marketing
4,065,600


One leased location in U.S.
Est. Breakeven: 4-1/2 years.
No building starts in Year 1 (lease space only).

- Centura Engine Plants
30 sites planned (10 in U.S., 20 International).
Est. Breakeven: Three years.
No building starts in Year 1.

- Centura Power Plants
280 sites planned (140 in U.S., 140 International).
Est. Breakeven: Three years.
No building starts in Year 1.

Equity Acquisitions:

- Nine equity/income stream acquisition targets.
- Acquisition costs amortized over first three years (Years 1-3).

Corporate Marketing / Marketing Communications:
12,500,000

- 15 to 20 entities in The Eduen Foundation will require marketing,
marketing communications efforts.
- Costs projected over first 10 years (Years 1-10).

Operating Units:
24,005,000

- Four specialized groups to be established to provide strong
infrastructure: The Design Group, The Legal Group,
The Business Development Group, The International Group.
- Costs projected over first six years (Years 1-6).
- Est. Breakeven: Six years.

Outside Professionals:
5,000,000

- Outside talent to augment/extend Eduen’s operational
infrastructure, including the formation and funding period.

- Costs amortized over the first two years (Years 1-2).

TOTAL:
$430,091,225

YEAR 2

The Three Cornerstones
$269,766,750

Lumina Water Technologies:

- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
93,818,000
No. of building starts in Year 2: Four.  

- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
108,000,000
No. of building starts in Year 2: Four.  

- Lumina Resort Spas
19,071,250
No. of building starts in Year 2: None.  

- Lumina Day Spas
126,000,000
No. of building starts in Year 2: Four.  

Blue Sky Dome Beta Test Project
155,155,000

Centura Prototype Engine / Fuel Production Lab / Pre-Launch Marketing
9,642,600

Corporate Marketing/Marketing Communications
43,000,000

Operating Units
27,995,000

Outside Professionals
3,000,000

TOTAL
$855,408,600

YEAR 3

The Three Cornerstones
$297,825,000

Expansion Sites: Eduen Gardens Health Spas & Learning Centers
224,323,000

Expansion Sites: Eduen Showcases of Green Living
44,464,750
No. of building starts in Year 3: One  

Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
81,147,000
No. of building starts in Year 3: One.  

Eduen Infinity Gardens
66,000,000
No. of building starts in Year 3: Two.  

Lumina Water Technologies:

- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
126,370,000
No. of building starts in Year 3: Four.  

- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
142,000,000
No. of building starts in Year 3: Four.  

- Lumina Resort Spas
13,755,500
No. of building starts in Year 3: None.  

-Lumina Day Spas
170,000,000
No. of building starts in Year 3: Four.  

Blue Sky Dome Beta Test Project
41,525,000

Centura Prototype Engine / Fuel Production Lab / Pre-Launch Marketing
26,624,400

Corporate Marketing / Marketing Communications
60,000,000

Operating Units
38,750,000

TOTAL:
$1,332,784,650

YEAR 4

The Three Cornerstones
$234,146,000

Expansion Sites: Eduen Gardens Health Spas & Learning Centers
592,801,000
No. of building starts in Year 4: Two.  

Expansion Sites: Eduen Showcases of Green Living
259,869,500
No. of building starts in Year 4: Two.  

Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
157,652,000
No. of building starts in Year 4: One.  

Eduen Infinity Gardens
421,619,000
No. of building starts in Year 4: Three.  


Lumina Water Technologies:

- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
172,354,000
No. of building starts in Year 4: Five.  

- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
190,000,000
No. of building starts in Year 4: Five.  

- Lumina Resort Spas
38,812,125
No. of building starts in Year 4: One.  

- Lumina Day Spas
229,000,000
No. of building starts in Year 4: Five.  

Blue Sky Dome Beta Test Project
27,445,000

Centura Energy Technologies:

- Centura Engine Plants
27,281,650
No. of building starts in Year 4: One.  

- Centura Power Plants
53,134,400
No. of building starts in Year 4: Four.  

Corporate Marketing / Marketing Communications
64,000,000

Operating Units
39,519,500

TOTAL:
$2,507,634,175

YEAR 5

The Three Cornerstones
$73,133,500

Expansion Sites: Eduen Gardens Health Spas & Learning Centers
986,469,000
No. of building starts in Year 5: Three.  
   
Expansion Sites: Eduen Showcases of Green Living
562,562,000
No. of building starts in Year 5: Two.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
232,298,000
No. of building starts in Year 5: One.  
   
Eduen Infinity Gardens
705,881,000
No. of building starts in Year 5: Three.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
289,065,000
No. of building starts in Year 5: Ten.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
322,000,000
No. of building starts in Year 5: Ten.  
   
- Lumina Resort Spas
30,346,250
No. of building starts in Year 5: None.  
   
- Lumina Day Spas
383,000,000
No. of building starts in Year 5: Ten.  
   
Blue Sky Dome Beta Test Project
21,780,000
   
Centura Energy Technologies:  
   
- Centura Engine Plants
9,229,000
No. of building starts in Year 5: None.  
   
- Centura Power Plants
129,439,200
No. of building starts in Year 5: Eight.  
   
Corporate Marketing / Marketing Communications
84,000,000
   
Operating Units
47,854,000
   
TOTAL: $3,877,056,950
   
YEAR 6  
   
The Three Cornerstones
$87,286,000
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
1,183,561,500
No. of building starts in Year 6: Three.  
   
Expansion Sites: Eduen Showcases of Green Living
715,115,500
No. of building starts in Year 6: Two.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
261,833,000
No. of building starts in Year 6: One.  
   
Eduen Infinity Gardens
866,357,250
No. of building starts in Year 6: Six.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
567,873,000
No. of building starts in Year 6: Twenty-Two.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
643,000,000
No. of building starts in Year 6: Twenty-Two.  
   
- Lumina Resort Spas
13,755,500
No. of building starts in Year 6: None.  
   
- Lumina Day Spas
821,500,000
No. of building starts in Year 6: Twenty-Two.  
   
Blue Sky Dome Beta Test Project
14,349,500
   
Centura Energy Technologies:  
   
- Centura Engine Plants
59,216,300
No. of building starts in Year 6: Two.  
   
- Centura Power Plants
176,307,200
No. of building starts in Year 6: Eight.  
   
Corporate Marketing / Marketing Communications
88,000,000
   
Operating Units
63,337,750
   
TOTAL: $5,561,492,500
   
YEAR 7  
   
The Three Cornerstones
$67,056,000
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
586,327,500
No. of building starts in Year 7: None.  
   
Expansion Sites: Eduen Showcases of Green Living
801,567,250
No. of building starts in Year 7: Three.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
206,036,000
No. of building starts in Year 7: None.  
   
Eduen Infinity Gardens
1,383,285,750
No. of building starts in Year 7: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
376,188,000
No. of building starts in Year 7: Four.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
408,000,000
No. of building starts in Year 7: Four.  
   
-Lumina Resort Spas
13,062,500
No. of building starts in Year 7: None.  
   
- Lumina Day Spas
580,500,000
No. of building starts in Year 7: Four.  
   
Centura Energy Technologies:  
   
- Centura Engine Plants
18,458,000
No. of building starts in Year 7: None.  
   
- Centura Power Plants
253,136,800
No. of building starts in Year 7: Twelve.  
   
Corporate Marketing / Marketing Communications
96,000,000
   
TOTAL:
$4,789,617,800
   
YEAR 8  
   
The Three Cornerstones
$79,156,000
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
224,782,500
No. of building starts in Year 8: None.  
   
Expansion Sites: Eduen Showcases of Green Living
879,065,000
No. of building starts in Year 8: None.  
   

Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers

155,381,000
No. of building starts in Year 8: None.  
   
Eduen Infinity Gardens
1,597,024,000
No. of building starts in Year 8: Three.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
331,394,000
No. of building starts in Year 8: Five.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
364,000,000
No. of building starts in Year 8: Five.  
   
- Lumina Resort Spas
62,774,250
No. of building starts in Year 8: Two.  
   
- Lumina Day Spas
519,500,000
No. of building starts in Year 8: Five.  
   
Centura Energy Technologies:  
   
- Centura Engine Plants
91,150,950
No. of building starts in Year 8: Three.  
   
- Centura Power Plants
355,998,800
No. of building starts in Year 8: Eighteen.  
   
Corporate Marketing / Marketing Communications
111,000,000
   
TOTAL:
$4,771,226,500
   
YEAR 9  
   
The Three Cornerstones
$126,923,500
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
214,825,000
No. of building starts in Year 9: None.  
   
Expansion Sites: Eduen Showcases of Green Living
535,859,500
No. of building starts in Year 9: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
109,060,000
No. of building starts in Year 9: None.  
   
Eduen Infinity Gardens
1,112,262,250
No. of building starts in Year 9: Six.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
371,805,000
No. of building starts in Year 9: Ten.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
430,000,000
No. of building starts in Year 9: Ten.  
   

- Lumina Resort Spas

141,141,000
No. of building starts in Year 9: Four.  
   
- Lumina Day Spas
591,500,000
No. of building starts in Year 9: Ten.  
   
Centura Energy Technologies:  
   
- Centura Engine Plants
27,687,000
No. of building starts in Year 9: None.  
   
- Centura Power Plants
281,621,000
No. of building starts in Year 9: Eight.  
   
Corporate Marketing / Marketing Communications
128,000,000
   
TOTAL:
$4,070,684,250
   
YEAR 10  
   
The Three Cornerstones
$118,206,000
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
206,132,500
No. of building starts in Year 10: None.  
   
Expansion Sites: Eduen Showcases of Green Living
220,880,000
No. of building starts in Year 10: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
108,262,500
No. of building starts in Year 10: None.  
   
Eduen Infinity Gardens
1,607,014,750
No. of building starts in Year 10: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
567,873,000
No. of building starts in Year 10: Twenty-Two.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
643,000,000
No. of building starts in Year 10: Twenty-Two.  
   
- Lumina Resort Spas
103,796,000
No. of building starts in Year 10: None.  
   
Lumina Day Spas
823,500,000
No. of building starts in Year 10: Twenty-Two.  
   
Centura Energy Technologies:  
   
- Centura Engine Plants
123,085,600
No. of building starts in Year 10: Four.  
   
- Centura Power Plants
365,509,200
No. of building starts in Year 10: Sixteen.  
   
Corporate Marketing / Marketing Communications
138,000,000
   
TOTAL:
$5,025,259,550
   
YEAR 11  
   
The Three Cornerstones
$78,449,500
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
249,720,000
No. of building starts in Year 11: None.  
   
Expansion Sites: Eduen Showcases of Green Living
250,965,000
No. of building starts in Year 11: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
151,882,500
No. of building starts in Year 11: None.  
   
Eduen Infinity Gardens
1,751,200,000
No. of building starts in Year 11: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
301,292,000
No. of building starts in Year 11: None.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
320,000,000
No. of building starts in Year 11: None.  
   
- Lumina Resort Spas
81,147,000
No. of building starts in Year 11: None.  
   
- Lumina Day Spas
416,000,000
No. of building starts in Year 11: None.  
   
Centura Energy Technologies:  
   
- Centura Engine Plants
36,916,000
No. of building starts in Year 11: None.  
   
- Centura Power Plants
458,883,200
No. of building starts in Year 11: Twenty-Four.  
   
Equity Acquistions
43,000,000
   
TOTAL:
$4,139,455,200
   
YEAR 12  
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
$296,450,000
No. of building starts in Year 12: None.  
   
Expansion Sites: Eduen Showcases of Green Living
256,974,000
No. of building starts in Year 12: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
184,612,000
No. of building starts in Year 12: None.  
   
Eduen Infinity Gardens
1,757,500,250
No. of building starts in Year 12: Six.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
199,930,000
No. of building starts in Year 12: None.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
214,000,000
No. of building starts in Year 12: None.  
   
- Lumina Resort Spas
74,800,000
No. of building starts in Year 12: None.  
   
- Lumina Day Spas
278,000,000
No. of building starts in Year 12: None.  
   
Centura Energy Technologies:  
   
- Centura Engine Plants
18,612,000
No. of building starts in Year 12: None.  
   
- Centura Power Plants
579,184,000
No. of building starts in Year 12: Twenty-Six.  
   
Equity Acquisitions
21,000,000
   
TOTAL:
$3,881,062,250
   
YEAR 13  
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
$305,250,000
No. of building starts in Year 13: None.  
   
Expansion Sites: Eduen Showcases of Green Living
239,652,000
No. of building starts in Year 13: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
156,277,000
No. of building starts in Year 13: None.  
   
Eduen Infinity Gardens
1,629,190,750
No. of building starts in Year 13: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
130,000,000
No. of building starts in Year 13: None.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
156,000,000
No. of building starts in Year 13: None.  
   
- Lumina Resort Spas
45,100,000
No. of building starts in Year 13: None.  
   
- Lumina Day Spas
208,000,000
No. of building starts in Year 13: None.  
   
Centura Power Plants
505,316,400
No. of building starts in Year 13: Sixteen.  
   
Equity Acquisitions
20,000,000
   
TOTAL:
$3,394,786,150
   
YEAR 14  
   

Expansion Sites: Eduen Gardens Health Spas & Learning Centers

$228,360,000
No. of building starts in Year 14: None.  
   
Expansion Sites: Eduen Showcases of Green Living
222,745,000
No. of building starts in Year 14: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
127,539,500
No. of building starts in Year 14: None.  
   
Eduen Infinity Gardens
1,729,024,000
No. of building starts in Year 14: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
599,168,000
No. of building starts in Year 14: Thirty-Two.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
704,000,000
No. of building starts in Year 14: Thirty-Two.  
   
- Lumina Resort Spas
154,497,750
No. of building starts in Year 14: Six.  
   
- Lumina Day Spas
864,500,000
No. of building starts in Year 14: Thirty-Two.  
   
Centura Power Plants
459,242,800
No. of building starts in Year 14: Sixteen.  
   
TOTAL:
$5,089,077,050
   
YEAR 15  
   
Expansion Sites: Eduen Gardens Health Spas & Learning Centers
$54,945,000
No. of building starts in Year 15: None.  
   
Expansion Sites: Eduen Showcases of Green Living
132,523,000
No. of building starts in Year 15: None.  
   
Expansion Sites: Eduen Paradise Health Spas & Natural Healing Centers
58,569,000
No. of building starts in Year 15: None.  
   
Eduen Infinity Gardens
1,757,500,250
No. of building starts in Year 15: Six.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
901,920,000
No. of building starts in Year 15: Thirty-Two.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
1,024,000,000
No. of building starts in Year 15: Thirty-Two.  
   
- Lumina Resort Spas
346,174,125
No. of building starts in Year 15: Nine.  
   
- Lumina Day Spas
1,280,500,000
No. of building starts in Year 15: Thirty-Two.  
   
Centura Power Plants
506,273,600
No. of building starts in Year 15: Twenty-Four.  
   
   
TOTAL:
$6,062,404,975
   
YEAR 16  
   
Expansion Sites: Eduen Showcases of Green Living
$59,640,000
No. of building starts in Year 16: None.  
   
Eduen Infinity Gardens
1,629,190,750
No. of building starts in Year 16: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
857,864,000
No. of building starts in Year 16: Eighteen.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
940,000,000
No. of building starts in Year 16: Eighteen.  
   
- Lumina Resort Spas
511,670,500
No. of building starts in Year 16: Ten.  
   
- Lumina Day Spas
1,218,500,000
No. of building starts in Year 16: Eighteen.  
   
Centura Power Plants
579,184,000
No .of building starts in Year 16: Twenty-Six.  
   
TOTAL
$5,796,049,250
   
YEAR 17  
   
Eduen Infinity Gardens
$1,729,024,000
No. of building starts in Year 17: Seven.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
548,378,000
No. of building starts in Year 17: None.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
596,000,000
No. of building starts in Year 17: None.  
   
- Lumina Resort Spas
392,887,000
No. of building starts in Year 17: None.  
   
- Lumina Day Spas
842,500,000
No. of building starts in Year 17: None.  
   
Centura Power Plants
868,460,400
No. of building starts in Year 17: Sixteen.  
   
TOTAL:
$4,977,249,400
   
YEAR 18  
   
Eduen Infinity Gardens
$1,757,500,250
No. of building starts in Year 18: Six.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
769,494,000
No. of building starts in Year 18: Twenty-Six.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
890,000,000
starts in Year 18: Twenty-Six.  
   
- Lumina Resort Spas
322,767,500
No. of building starts in Year 18: None.  
   
- Lumina Day Spas
1,482,500,000
No. of building starts in Year 18: Forty.  
   
Centura Power Plants
459,242,800
No. of building starts in Year 18: Sixteen.  
   
TOTAL:
$5,681,504,550
   
YEAR 19  
   
Eduen Infinity Gardens
$1,398,190,750
No. of building starts in Year 19: None.  
   
Lumina Water Technologies:  
   
- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
450,576,000
No. of building starts in Year 19: None.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
524,000,000
No. of building starts in Year 19: None.  
   
- Lumina Resort Spas
232,100,000
No. of building starts in Year 19: None.  
   
- Lumina Day Spas
326,000,000
No. of building starts in Year 19: None.  
   
Centura Power Plants
506,273,600
No. of building starts in Year 19: Twenty-Four.  
   
TOTAL:
$3,437,140,350
   
YEAR 20  
   

Eduen Infinity Gardens

$889,857,500

No. of building starts in Year 20: None.

 
   
Lumina Water Technologies:

 

- Lumina Water Production and Bottling Plants (200,000-gallon daily capacity)
407,190,000
No. of building starts in Year 20: None.  
   
- Lumina Water Production and Bottling Plants (400,000-gallon daily capacity)
438,273,000
No. of building starts in Year 20: None.  
   
- Lumina Resort Spas
212,750,000
No. of building starts in Year 20: None.  
   
- Lumina Day Spas
561,000,000
No. of building starts in Year 20: None.  
   
Centura Power Plants
462,792,600
No. of building starts in Year 20: Eighteen.  
   
TOTAL:
$2,971,863,100
   
   
   
20-YEAR TOTAL:
$78,651,848,475
AVERAGE COSTS PER YEAR:
$3,932,592,424


NOTE: Code names have been used for two of the entities described above. At such time a mutually-binding Non-Disclosure, Non-Compete, Non-Circumvent document is signed, the organizations’ actual names and additional information will be provided.




Contact
.

Don Hunt
Project Manager
Telephone

520-870-5824

E-mail
webmaster@communicationservicescompany.com